The Kings - Refurbishment

Week 5/6

Image44.jpg (80206 bytes) Image45.jpg (81757 bytes) Image46.jpg (122508 bytes)
Image47.jpg (109569 bytes) Image48.jpg (78445 bytes) Image52.jpg (65524 bytes)
Image51.jpg (72287 bytes) Top right a dirty beer pump - then clean - finally all four cleaned and polished. Above left new joists are fitted. Centre the bar cleaned and left the new toilets now plaster boarded. Left and right the new floor going in upstairs. Image50.jpg (78362 bytes)
Image53.jpg (103876 bytes) Image49.jpg (111684 bytes) Image54.jpg (90619 bytes)
Image55.jpg (85815 bytes) Above left the "Western Bar" Above and above right the bar area taking shape. Left the new oaks in the ceiling right Ron and Glen discussing the next move. Below left the new stairs arrive and left fitted. Image56.jpg (83308 bytes)
Image57.jpg (97199 bytes)

NEXT PAGE

HOME PAGE

Image58.jpg (84384 bytes)